• Automatic Top-to-Bottom Tank Construction Machine
  • Automatic Top-to-Bottom Tank Construction Machine
  • Automatic Top-to-Bottom Tank Construction Machine
  • Automatic Top-to-Bottom Tank Construction Machine
  • Automatic Top-to-Bottom Tank Construction Machine
  • Automatic Top-to-Bottom Tank Construction Machine

Automatic Top-to-Bottom Tank Construction Machine

Type: Arc Welders
First X-ray Qualification Rate: Above 99%
More Suitable for Erection of Tanks: Less Than 50m
Control Mode: PLC
Welding Process: TIG/MIG/Saw
Brand Name: Naec
Customization:
Diamond Member Since 2011

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
AUTO
Current
Alternating Current
Model
TIG
Application
Aerospace
Transport Package
Packed in Container
Specification
SGS, ISO9001: 2008
Trademark
AUTO ELECTRIC
Origin
China
HS Code
85153190
Production Capacity
200 Sets/Year

Product Description

Automatic Top-to-Bottom Tank Construction machine
Features:
1, AGW is applied in both inside and outside girth seam welding
2, EGW is only needed for outside vertical seam welding
3, All the machines are applicable to top-to-bottom tank erection with ground rail
4, First X-ray qualification rate: Above 99%
5, More suitable for erection of tanks less than 50M
6, Hydraulic lifting device is necessary
7, Max. Efficiency of welding machines: 30 times of manual welding(AGW), 50 times of manual welding(EGW)

Automatic Top-to-Bottom Tank Construction Machine
Automatic Top-to-Bottom Tank Construction Machine
Automatic Top-to-Bottom Tank Construction Machine
 
Configurations:
-Plate Edge Fabrication machines
-Automatic girth welding machine(outside)
-Automatic girth welding machine(inside)
-Automatic electro-gas vertical welding machine
-Hydraulic system
-Butt/corner sub-arc automatic welding machine

For tank erection, we can provide not only high efficient automatic machine, but also installation & Commission service, site construction instructing, welding procedure qualification supporting, and construction team training. We have very mature experience in both bottom-to-top and top-to-bottom tank construction.

 

Tank Construction Machines

1
Automatic Top-to-Bottom Tank Construction Machine

Girth Seam Welding Machine

>Applicable to both bottom-to-top and top-to-bottom tank erection

>Adopting Sub Arc Welding technology

>Standard machine suitable for shell plate width: 1.3M-2.8M

>Max. Efficiency of AGW could be 30 times as manual welding

2
Automatic Top-to-Bottom Tank Construction Machine

Vertical Seam Welding Machine

>Suitable for tank plate wall thickness is from 10mm to 50mm

>Motor frequency inverter drive system

>Weatherproof control box with digital display for welding speed

>Travel speed: 0~2200mm/min

>Beveled gear drive reducer, good locking ability in both directions

3
Automatic Top-to-Bottom Tank Construction Machine

Butt/Corner Seam Welding Machine

>Applicable to butt seam welding of bottom plates

>With magnetic idler system

>More than 99% Qualified first X-ray test.

>Suitable for both Top-to-Bottom and Bottom-to-Top Tank Construction Method

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now