Hydraulic Jacking System for Tanks Construction

  • Audited Supplier
  • 16 yrs

Contact Supplier

Product Highlights

  • PLC Synchronous Control: PLC control ensures synchronous lifting with 5 cylinders, each 25T capacity.
  • High Welding Efficiency: Automatic Girth Seam Welding efficiency is up to 30 times that of manual welding.
  • Versatile Tank Construction: Supports both bottom-to-top and top-to-bottom tank erection methods.
  • Wide Application Range: Suitable for shell plate widths from 1.3M to 2.8M and wall thickness 10-50mm.
  • High Quality Assurance: Butt/Corner Seam Welding achieves over 99% qualified first X-ray test rate.
  • Modular Design: Small hydraulic power pack with 5 cylinders, modules connect synchronously.
  • Professional After-Sales: Engineers available to service machinery overseas for technical support.
  • Proven Industry Reference: Used by major companies like CCC, L&T, PEC, and Rotary Engineering.

Product Images of Hydraulic Jacking System for Tanks Construction

Hydraulic Jacking System for Tanks Construction
Hydraulic Jacking System for Tanks Construction pictures & photos
Hydraulic Jacking System for Tanks Construction
Hydraulic Jacking System for Tanks Construction pictures & photos
Hydraulic Jacking System for Tanks Construction
Hydraulic Jacking System for Tanks Construction pictures & photos
Hydraulic Jacking System for Tanks Construction
Hydraulic Jacking System for Tanks Construction pictures & photos
Hydraulic Jacking System for Tanks Construction
Hydraulic Jacking System for Tanks Construction pictures & photos
Hydraulic Jacking System for Tanks Construction
Hydraulic Jacking System for Tanks Construction pictures & photos
Hydraulic Jacking System for Tanks Construction
  • Hydraulic Jacking System for Tanks Construction
  • Hydraulic Jacking System for Tanks Construction
    Hydraulic Jacking System for Tanks Construction
  • Hydraulic Jacking System for Tanks Construction
    Hydraulic Jacking System for Tanks Construction
  • Hydraulic Jacking System for Tanks Construction
    Hydraulic Jacking System for Tanks Construction
  • Hydraulic Jacking System for Tanks Construction
    Hydraulic Jacking System for Tanks Construction
  • Hydraulic Jacking System for Tanks Construction
    Hydraulic Jacking System for Tanks Construction
  • Hydraulic Jacking System for Tanks Construction
    Hydraulic Jacking System for Tanks Construction

Find Similar Products

Product Description

NAEC---- Minimize the outdoor work, Maxmize customer's profit!
Suitable for industries of: OIL AND GAS, REFINERY FACILITIES, OFFSHORE &SHIPBUILDING, POWER PLANT, etc
Reference: CCC, L&T, PEC, Rotary Engineering, Petrol Steel, JSL, etc.

Automatic Top-to-Bottom Tank Welding Hydraulic Jacking System

   
Hydraulic Jacking System for Tanks Construction

We provide complete solution for tank welding with different construction method, both bottom-to-top and top-to-bottom tank construction, hydraulic lifting system are especially designed for top-to-bottom tank erection.

Features:

1. Matching with all automatic welding equipments.
2. Module design, a small hydraulic power pack with 5 cylinders, each module can be connected synchronously.
3. The lifting capacity of each cylinder is 25T(18T, 100%).
4. PLC control, synchronously lifting.

Tank Construction Machines

1
Hydraulic Jacking System for Tanks Construction

Girth Seam Welding Machine

>Applicable to both bottom-to-top and top-to-bottom tank erection

>Adopting Sub Arc Welding technology

>Standard machine suitable for shell plate width: 1.3M-2.8M

>Max. Efficiency of AGW could be 30 times as manual welding

2
Hydraulic Jacking System for Tanks Construction

Vertical Seam Welding Machine

>Suitable for tank plate wall thickness is from 10mm to 50mm

>Motor frequency inverter drive system

>Weatherproof control box with digital display for welding speed

>Travel speed: 0~2200mm/min

>Beveled gear drive reducer, good locking ability in both directions

3
Hydraulic Jacking System for Tanks Construction

Butt/Corner Seam Welding Machine

>Applicable to butt seam welding of bottom plates

>With magnetic idler system

>More than 99% Qualified first X-ray test.

>Suitable for both Top-to-Bottom and Bottom-to-Top Tank Construction Method

About the Supplier

This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR2441249". Items marked "verified" are certified.

Watch Video
Watch Video
Nanjing Auto Electric Co., Ltd.
Nanjing Auto Electric Co., Ltd.
Nanjing Auto Electric Co., Ltd.
Nanjing Auto Electric Co., Ltd.
Nanjing Auto Electric Co., Ltd.
Nanjing Auto Electric Co., Ltd.
Nanjing Auto Electric Co., Ltd.
Nanjing Auto Electric Co., Ltd.

About Our Factory & Business Background

Address
11th Floor, B4, Jiulonghu International Headquarter Park, No. 19 Suyuan Avenue, Jiangning District, Nanjing, Jiangsu, China
Terms of Payment
LC, T/T
International Commercial Terms(Incoterms)
FOB, CFR, CIF, Others
Average Lead Time
Peak Season Lead Time: 6-12 months
Off Season Lead Time: 1-3 months
Nearest Port
shanghai, nanjing, ningbo

Our Production Capability & Technical Expertise

Main Products
Pipe Spool Fabrication Solution, Pipe Cutting and Beveling All-in-One Machine, High Speed Band Saw Cutting Machine, Automatic Pipe Welding Machine, Sub-Arc Girth Welding Machine, Automatic Electric-Gas Vertical Welding Machine, Plate Cutting and Milling Machine, CNC Pipe End Beveling Machine, Multi-Function Pipe Fitting-up Station, Automatic Elbow Welding Machine

Our Industry Experience & Global Business Record

Export Year
2008-01-01
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

FAQ

What industries is this system suitable for?
It is suitable for Oil & Gas, Refinery Facilities, Offshore & Shipbuilding, and Power Plants.
What is the lifting capacity of each cylinder?
The lifting capacity of each cylinder is 25T, with a 100% load capacity of 18T.
Does the system support both construction methods?
Yes, it supports both bottom-to-top and top-to-bottom tank erection methods.
What is the lead time for production?
Peak season lead time is 6-12 months, while off-season lead time is 1-3 months.
What payment terms are accepted?
We accept LC (Letter of Credit) and T/T (Telegraphic Transfer) as payment terms.
Is after-sales service provided?
Yes, engineers are available to service the machinery overseas.
What is the travel speed of the welding machine?
The travel speed ranges from 0 to 2200mm/min with a motor frequency inverter drive.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now