Jiangsu, China
Business Type:
Manufacturer/Factory
Management System Certification:
ISO 9001, HSE
OEM/ODM Service

Storage Tank Construction Welding Machine, Tank Construction, Welding Machine manufacturer / supplier in China, offering Storage Tank Construction Welding Machine, Pipe Cutting Machine, Band Saw Cutting Machine and so on.

Gold Member Since 2011
Audited Supplier

Storage Tank Construction Welding Machine

Get Latest Price
Min. Order: 1 Piece
Port: Shanghai, China
Transport Package: Packed in Container
Payment Terms: L/C, T/T, D/P
Type: ARC Welders
Current: Alternating Current
Application: Container
Trademark: NAEC
Origin: China

You Might Also Like

Loading...

Product Description

NAEC---- Minimize the outdoor work, Maxmize customer's profit!

Suitable for industries of: OIL AND GAS, REFINERY FACILITIES, OFFSHORE &SHIPBUILDING, POWER PLANT, ETC

Reference: CCC, L&T, PEC, Rotary Engineering, Petrol Steel, JSL, ETC.

 

Tank Construction Machine; Automatic Tank Welding Machine; Automatic Tank Welder

Storage Tank Construction Welding Machine

Storage Tank Construction Welding Machine

 

Features:

1Suitable for diameter of several meters to one hundred meters
2Max. Efficiency of welding machines: 30 times of manual welding(AGW); 50 times of manual welding(EGW)
3Applicable to both bottom-to-top and top-to-bottom tank erection
4First X-ray qualification rate: Above 99%


Configuration:
-Plate cutting; Edge milling machine
-Automatic girth welding machine(AUTO AGW)
-Automatic electro-gas vertical welding machine(AUTO EGW)
-Automatic butt/corner seam welding machine
-Hydraulic lifting /jacking system
-Automatic girth seam grinder
-LNG tank welder

 

For storage tank / tower fabrication and on site construction, we begin to R & D of its automatic equipments and turn-key whole solution since year 2001. After years of development, NAEC developed different fabrication and construction machines for various seams of Oil Storage Tank / LNG Tank / Tower / Tank Farm. The automatic tank welding machines we developed meet CE standard. In the meantime, NAEC also developed matched equipments for top-to-bottom construction method, which has been widely applied in both China Strategic Oil Storage Project and oversea tank construction project.

 

Now NAEC has matured whole solution & equipment for both bottom-to-top and top-to-bottom tank construction. By NAEC solution, we can help our client to finish one tank construction within one month. The X-ray first qualification rate is no less than 99.5%. And the mechanical performance meets the requirements of low-temperature impact test.

 

Send your message to this supplier

*From:
*To:
avatar Mrs. Amanda Wang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now